Air India Express IX2875

Bengaluru to Vijayawada

Mon, Mar 2
Fri, Mar 6

Access extensive flight status info directly on the app!

Arrived

BLR
Bengaluru, Mon, Mar 2
07:59
Scheduled: 06:10
Check-in
B29-B30,E1-E15,D25-D30
Terminal
T2
Gate
D24
departured icon
Departure
Flight time: 1h 30m
arrived icon
Arrival
VGA
Vijayawada, Mon, Mar 2
08:54
Scheduled: 07:40
Baggage
--
Terminal
--
Gate
--

Access extensive flight status info directly on the app!

Scheduled

Scheduled to depart in 27h 38m

BLR
Bengaluru, Fri, Mar 6
06:10
Scheduled: 06:10
Check-in
E
Terminal
T2
Gate
--
waiting to departure icon
Departure
Flight time: 1h 30m
haven't arrived icon
Arrival
VGA
Vijayawada, Fri, Mar 6
07:40
Scheduled: 07:40
Baggage
--
Terminal
--
Gate
--
Download app to track flight status
Google Play
4.8
504k reviews
App Store
4.9
36.2k reviews
Download app to track flight status

IX2875 flight details

The aircraft model for flight IX2875 is Boeing 737 MAX 8, operated by Air India Express, and features 178 seats.
Airline: Air India Express Boeing 737 MAX 8 Boeing 737 MAX 8
Airline: Air India Express
Distance flown: --
Age: 2y, 5m
Seats: 178
Meal service: available
Wi-Fi: Available
USB port: Available
Entertainment: available
Recline angle: 100°
Seat width: 43 cm
Legroom: --

IX2875 flight schedules

Flight IX2875's latest flight is scheduled to depart at Fri, Feb 27 06:40 (local time) and arrive at Fri, Feb 27 07:54 (local time). The latest flight information is provided by Whatflytime.
Date Route Departure Arrival Aircraft Status
Fri, Feb 27 BLR - VGA
Actual: 07:02
Scheduled: 06:10
Actual: 07:58
Scheduled: 07:40
Boeing 737 MAX 8 Arrived
Tue, Feb 24 BLR - VGA
Actual: 06:41
Scheduled: 06:10
Actual: 07:31
Scheduled: 07:40
Boeing 737 MAX 8 Arrived
Sun, Mar 1 BLR - VGA
Actual: 06:43
Scheduled: 06:10
Actual: 07:34
Scheduled: 07:40
Boeing 737 MAX 8 Arrived
Sat, Feb 28 BLR - VGA
Actual: 06:13
Scheduled: 05:55
Actual: 07:06
Scheduled: 07:25
Boeing 737 MAX 8 Arrived
Thu, Feb 26 BLR - VGA
Actual: 06:26
Scheduled: 06:10
Actual: 07:17
Scheduled: 07:40
Boeing 737 MAX 8 Arrived
Wed, Feb 25 BLR - VGA
Actual: 07:07
Scheduled: 06:10
Actual: 07:57
Scheduled: 07:40
Boeing 737 MAX 8 Arrived
Mon, Mar 2 BLR - VGA
Actual: 07:59
Scheduled: 06:10
Actual: 08:54
Scheduled: 07:40
Boeing 737 MAX 8 Arrived
Date Departure Arrival Status
Fri, Feb 27
Actual: 07:02
Scheduled: 06:10
Actual: 07:58
Scheduled: 07:40
Arrived
Tue, Feb 24
Actual: 06:41
Scheduled: 06:10
Actual: 07:31
Scheduled: 07:40
Arrived
Sun, Mar 1
Actual: 06:43
Scheduled: 06:10
Actual: 07:34
Scheduled: 07:40
Arrived
Sat, Feb 28
Actual: 06:13
Scheduled: 05:55
Actual: 07:06
Scheduled: 07:25
Arrived
Thu, Feb 26
Actual: 06:26
Scheduled: 06:10
Actual: 07:17
Scheduled: 07:40
Arrived
Wed, Feb 25
Actual: 07:07
Scheduled: 06:10
Actual: 07:57
Scheduled: 07:40
Arrived
Mon, Mar 2
Actual: 07:59
Scheduled: 06:10
Actual: 08:54
Scheduled: 07:40
Arrived

IX2875 punctuality rate

IX2875 will depart from Kempegowda International Airport at Fri, Feb 27 06:40, arriving at Vijayawada Airport at Fri, Feb 27 07:54. The recent on-time departure rate is 37%. The recent on-time arrival rate is 63%. The average delay is 45m.
BLR (Kempegowda International Airport) - VGA (Vijayawada Airport)
  • Departure:
    37% on time
  • Arrival:
    63% on time
  • Average delay:
    45min
Delayed
88m
66m
44m
22m
On time
24 Feb
25
26
27
28
1
2 Mar
IX2875
Whatflytime is a global flight tracker that provides real-time status updates using trusted data from Trip.com. With multilingual support and worldwide coverage, it's your reliable source for up-to-date flight information.
Current language: Singapore English